Monday, September 30, 2019

Organic Chemistry Experiment 4 †Recrystallization Essay

INTRODUCTION Recrystallization is the primary method for purifying solid organic compounds. Compounds obtained from natural sources or from reaction mixtures almost always contain impurities. The impurities may include some combination of insoluble, soluble, and colored impurities. To obtain a pure compound, these impurities must be removed. Each is removed in a separate step in the recrystallization procedure. [8] Acetylation of aniline by acetic anhydride was performed to synthesize the crude acetanilide. The obtained crude acetanilide contained acetic acid as well as unreacted acetic anhydride. The said impurities of the crude acetanilide were removed using activated charcoal, filtration and recrystallization. EXPERIMENTAL A. Compounds tested Aniline Aniline is a clear to slightly yellow liquid with a characteristic odor. It does not readily evaporate at room temperature. Aniline is slightly soluble in water and mixes readily with most organic solvents. Aniline is used to make a wide variety of products such as polyurethane foam, agricultural chemicals, synthetic dyes, antioxidants, stabilizers for the rubber industry, herbicides, varnishes and explosives. [2] Aniline is prepared commercially by the catalytic hydrogenation of nitrobenzene or by the action of ammonia on chlorobenzene. The reduction of nitrobenzene can also be carried out with iron borings in aqueous acid. [6] Preparation of Aniline: C6H5NO2 + 3 H2 → C6H5NH2 + 2 H2O (a) (b) Figure 1. (a) Hydrogenation of nitrobenzene (b) Bechamp reduction Acetic anhydride Acetic anhydride is clear, colorless liquid with a strong, pungent, sour vinegar-like odor, lachrymator. [5] Acetic anhydride is an important solvent and acetylation agent. [4] It is used in the manufacture of acetyl compound, cellulose acetates, acetylizer and solvent in examining wool fat, glycerol, fatty and volatile oils, resins, detection of rosin, in organic synthesis, such as dehydrating agent in nitrations, sulfonations and other reactions where removal of water is necessary. [5] Acetic anhydride is prepared by the carbonylation of methyl acetate. There is a two-stage process for the preparation of acetic anhydride, in which, in a first step, methyl bromide or, preferably, iodide is carbonylated to provide the corresponding acetyl halide, such acetyl halide in turn being reacted with methyl acetate, in a second step, to provide acetic anhydride, which corresponds to the following reaction scheme, in the event that methyl iodide is the starting material: [7] Step 1: CH3I + CO → CH3COI Step 2: CH3COI + CH3COOCH3 → (CH3CO)2O + CH3I Figure 2. Carbonylation of methyl acetate B. Procedure 1. Choosing the Recrystallizing Solvent A corn-grain amount of pure acetanilide was placed into each of three test tubes. Methanol, hexane, and water were added to each test tube respectively. Each was shaken and was placed in a warm bath (37oC-40oC) for 1-5 minutes and then was cooled. Figure 3. Pure acetanilide in test tubes containing different solvents – methanol, hexane, water respectively. 2. Acetylation of Aniline by Acetic Anhydride Aniline solution was made by mixing 2mL of aniline with 20mL of distilled water. 3mL of acetic anhydride was then added to the solution to form acetylation. The over-all solution was then placed in an ice bath to form crystals of crude acetanilide. Figure 4. 2mL of aniline mixed with 20mL of distilled water Figure 5. 3mL of acetic anhydride added to the aniline solution Figure 6. Crystallization of crude acetanilide in an ice bath 3. Purification of Crude Acetanilide by Recrystallization The crude acetanilide crystals were filtered through a wet filter paper. The residue was then dried and weighed. In a separate Erlenmeyer flask, the crude acetanilide residue was placed and 20mL of the recrystallizing solvent was added. The solution was then heated on a hot plate until the entire solid dissolved completely. When the solution became colored, it was removed from the heat and enough amount of activated charcoal was added. The heating process continued until the solution became colorless. While the solution was still hot, it was quickly filtered using a fluted filter paper. Its filtrate was then cooled by placing the receiver in a beaker with cold water. The crystals that formed were collected and were washed. When the crystals completely dried up, it was then weighed. Figure 7. Filtration of the crude acetanilide crystals Figure 8. Crude acetanilide residue mixed with the recrystallizing solvent Figure 9. Heating process of the solution Figure 10. Addition of the activated charcoal to the solution Figure 11. Continued heating process of the solution until colorless Figure 12. Filtration and recrystallization of the acetanilide Figure 13. Weighing of the dried acetanilide crystals RESULTS AND DISCUSSION 1. Choosing the Recrystallizing Solvent Among the three recrystallizing solvents – methanol, hexane, and water, water was chosen to be used in the recrystallization of the acetanilide. Table 1. Solubility of pure acetanilide in various solvents | At room temp.| During heating| Upon cooling| Water| Insoluble| Soluble| Insoluble| Methanol| Soluble| Soluble| Soluble| Hexane| Insoluble| Insoluble| Insoluble| 2. Acetylation of Aniline by Acetic Anhydride The crude acetanilide was obtained by the acetylation of the aniline. The crude acetanilide obtained was 7.2 grams in its weight. 3. Purification of Crude Acetanilide by Recrystallization Pure acetanilide was obtained by the recrystallization of the crude acetanilide. From the 7.2 grams of crude acetanilide, 1.2 grams of pure acetanilide was gathered. Theoretical Yield: Aniline 2mL x 1.0217 g/mL = 2.0434 g 2.04 g x 1 mol x 135.17 g = 93.13 g 1 mol 2.96 g Acetanilide Acetic Anhydride 3mL x 1.082 g/mL = 3.246 g 3.246 g x 1 mol x 135.17 g = 102.09 g 1 mol 4.30 g Acetanilide ∠´ Aniline is the limiting reagent. Percentage Yield: = Actual Yield x 100 Theoretical Yield = 1.20 grams x 100 2.96 grams = 40.54 % The experiment conducted was able to perform different chemical processes. In choosing the recrystallizing solvent, solubility test was conducted among various solvents – methanol, hexane, and water. The solubility test resulted to the conclusion of choosing water as the recrystallizing solvent. The experiment also included the acetylation of aniline by acetic anhydride to form the crude acetanilide. In the experiment, 7.2 grams of crude acetanilide was obtained. Since the crude acetanilide has impurities, it was purified by several processes – heating of solution, activated charcoal addition, and recrystallization. When recrystallization has already occurred in the solution, the pure acetanilide was then obtained. 40.54% of the pure acetanilide was gathered with its weight of 1.2 grams. REFERENCES [1] Acetylation of Aniline using Acetic Anhydride. http://prolabscientific.com/Acetylation-of-Aniline-using-Acetic-Anhydride-p-23917.html. [2] Agency for Toxic Substances & Disease Registry: Toxic Substances Portal – Aniline. http://www.atsdr.cdc.gov/toxfaqs/tf.asp?id=449&tid=79. [3] Bayquen, A. V., Cruz, C. T., de Guia, R. M., Lampa, F. F., PeÅ„a, G. T., Sarile, A. S., & Torres, P. C. (2009). Laboratory Manual in Organic Chemistry. 839 EDSA, South Triangle, Quezon City: C & E Publishing, Inc. [4] Chemical Book: Acetic Anhydride. http://www.chemicalbook.com/ChemicalProductProperty_EN_CB2852742.htm. [5] Chemical Book: Acetic anhydride (108-24-7). http://www.chemicalbook.com/ProductMSDSDetailCB2852742_EN.htm. [6] Encyclopà ¦dia Britannica: Aniline. http://global.britannica.com/EBchecked/topic/25473/aniline. [7] Gauthier-Lafaye et al. Carbonylation of methyl acetate. http://www.google.com.ph/patents?hl=en&lr=&vid=USPAT4500474&id=ymY2AAAAEBAJ&oi=fnd&dq=carbonylation+of+methyl+ acetate&printsec=abstract#v=onepage&q=carbonylation%20of%20methyl%20acetate&f=false. [8] Recrystallization. http://www.chem.umass.edu/~samal/269/cryst1.pdf.

Sunday, September 29, 2019

Family Law- Hindu Law

DARSHAN SINGH PATIALVI – ADVOCATE GENERAL | Restitution Of Conjugal Rights: Criticism Revisited| Introduction:- Section 1[1] of the Hindu Marriage Act, 1955 embodies the concept of  Restitution of Conjugal Rights  under which after solemnization of marriage if one of the spouses abandons the other, the aggrieved party has a legal right to file a petition in the matrimonial court for restitution of conjugal rights. This right can be granted to any of the spouse.This section is identical to section 22 of the Special Marriage Act, 1954. [2] The provision is in slightly different wordings in the Parsi Marriage and Divorce Act, 1936, but it has been interpreted in such a manner that it has been given the same meaning as under the Hindu Marriage Act, 1955 and the Special Marriage Act, 1954. However, the provision is different under the section 32 Indian Divorce Act, 1869 but efforts are being made to give it such an interpretation so as to bring it in consonance with the other l aws.The provision under Muslim law is almost the same as under the modern Hindu law, though under Muslim law and under the Parsi Marriage and Divorce Act, 1936 a suit in a civil court has to be filed and not a petition as under other laws. [3]The constitutional validity of the provision has time and again been questioned and challenged. The earliest being in 1983 before the Andhra Pradesh High Court[4] where the Hon'ble High Court held that the impugned section was unconstitutional. The Delhi High Court in  Harvinder Kaur v Harminder Singh,[5] though had non-conforming views.Ultimately Supreme Court in  Saroj Rani v. Sudharshan,[6] gave a judgment which was in line with the Delhi High Court[7] views and upheld the constitutional validity of the section 9 and over-ruled the decision given in  T. Sareetha v. T. Venkatasubbaiah. [8]It is a sad commentary that despite various courts including the Apex Court of the Country upholding the validity of section 9. Many jurists still hav e doubts with respect to the soundness of this section and demand its abolishment.Abolitionist's View The abolitionists argue that it is a remedy that was unknown to Hindu law till the British introduced it in the name of social reforms. Even when the Hindu Marriage Act, 1955 was being passed in the Parliament, there were voices of scepticism regarding the efficacy of this remedy. [9] Sir J. Hannen in  Russell v. Russell[10] also vehemently opposed the remedy. Further, they are of the view any law that forces any person to live with another person is contrary to the value of the society.The remedy openly violates the fundamental right to life, privacy and equality hence is unconstitutional. Further more, there is frequently insincerity in the petitioner's intention. The remedy is blatantly misused to achieve ulterior purposes other than reconciliation, the root cause being S. 13 (1-A)(ii) of the Hindu Marriage Act, 1955 and has created an additional ground of divorce. Yet another major problem with restitution petitions is that it is used as a defence for maintenance suits. This remedy has been repeatedly misused, abused and exploited. 11]Adding more, the procedure prescribed to enforce this decree under Order 21 Rule 32 of Civil Procedure Code, 1908 is also criticized on the ground that in India, where most of the population and especially women (wife) do not have actual possession over any property. In such cases, if a restitution decree is not complied with, then the court is required to ascertain the share of the wife in the property of her husband, when it is not divided and arrive at her share in the property, but this involves cumbersome procedures.Difficulty also arises if the husband does not have a property in his name. Further, it is not correct to think that coercing a person that his property would be attached and sold away can change the attitude of the adamant spouse and make him obey the decree. Counter View However, in my opinion, section 9 of the Hindu Marriage Act is one of the most misunderstood sections of the Matrimonial law. Despite the controversy it has continuously been upheld by the Judiciary.Even the legislature through various committees and its reports has supported this section. All the reasons so stated by abolitionists can be easily encountered if this socially benefiting section is read in the right light and its essence is understood. It is imperative that a clear understanding of the section 9 is required because it is often invoked. First of all, it cannot be said that the concept of conjugal rights and that its embodiment in section 9 is foreign to the Indian culture and society.It may be borne in mind that conjugal rights. Such a right is inherent in the very institution of marriage itself. [12] The only thing is new is the embodiment of this concept which has been prevailing since antiquity. The prime objective of section 9 is to preserve the marriage. [13] According to the Hindu Marriage Act mar riage is a civil contract and a religious ceremony. [14] It is a contract of the greatest importance in civil institutions, and it is charged with a vast variety of rights and obligation,[15] cohabitation being one of them.It is the very soul of marriage and this section enforces the right of cohabitation. If there is no reasonable ground for living apart, the court orders for cohabitation and enforces the Contract there is nothing wrong as the parties had voluntarily stipulated this at the time of entering into the marriage bond. [16]Section 9, in actuality, is a means of saving the marriage, it is in a sense an extension of sub-sections (2) and (3) of section 23 of the Act which encourage reconciliation by the court.It is the policy of the Act that the parties should live together and assist in the maintenance of marriages. [17] By enforcing cohabitation, the court is serving this purpose of the Act. Further, it is criticized on the ground that it allows the withdrawing spouse to take an advantage of his own wrong, which is against the scheme of section 23 and allows him/her to apply for a decree in case of non consummation of the marriage within one year of passing of decree. However in  Dharmendra Kumar v.Usha Kumari,[18] the Hon'ble Court clearly stated that The expression â€Å"in order to be a  Ã¢â‚¬Ëœwrong†Ã‚  within the meaning of section 23(1) (a) the conduct alleged has to be something more than mere disinclination to agree to an offer of reunion, it must be misconduct serious enough to justify denial of the relief to which the husband or the wife is otherwise entitled to. [19]It is also often claimed to be gender discriminatory and violative of Article 14. T. Sareetha case[20] confirmed this view. It is obvious that the judge considered the entire question of restitution from the point of view of the woman.It seems that it has been overlooked that restitution of conjugal rights can also be claimed by the wife. It is relevant to state tha t the section is gender neutral as by the Amending Act 44 of 1964 either party to a marriage has been allowed to present a petition for divorce on the ground given in section 13(1-A). Even the party found guilty in restitution proceedings is entitled to petition for divorce under section 13 (1-A)(ii). There is complete equality of sexes here and equal protection of the laws. [21] Therefore this claim of abolitionist is incorrect.Section 9 is also criticized for being an instrument of forced sexual relation and hence being violative of right to privacy guaranteed under Article 21. But much contrary is its purpose. The remedy of restitution aims at cohabitation and consortium and not merely at sexual intercourse. [22] In  Halsbury's Laws of England[23]  it is observed: (cohabitation) aces not necessarily mean serial intercourse, which the court cannot enforce, so that refusal of sexual intercourse by itself does not constitute refusal to cohabit. [24] In support of this propositio n the high authority of Lord Stowell in  Forster v. Forster,[25]  Orme v. Orme, [26] and  Rowe v. Rowe[27] may be cited. One thing is clear from Lord Stowell's decision in  Forster v. Forster[28] and Halsbury's statement of law that the Court does not and cannot enforce sexual intercourse. In cases like T Sareetha, [29] the concept of marriage is pictured as if consists as if it consists of nothing else except sex. Chaudhary, J. ‘s over-emphasis on sex is the fundamental fallacy in his reasoning.He seems to suggest that restitution decree has only one purpose, that is, to compel the unwilling wife to â€Å"have sex with the husband†. This view was discarded long ago in as early as 1924 Sir Henry Duke President in  Jackson v. Jackson. [30]To say that restitution decree â€Å"subject a person by the long arm of the to a positive sex act† is to take the grossest view of the marriage institution. [31]Therefore, it is fallacy to hold that the restitution of conjugal rights constituted â€Å"the starkest form of governmental invasion† of â€Å"marital privacy†. 32] Further, applying the standard that law has to be just, fair and reasonable as enunciated inManeka Gandhi,[33] section 9 said tries to bring the parties together. Whether to grant restitution decree would be just, fair and reasonable in the facts and circumstances of a given case is left to the court to be decided in its judicial discretion. What better guarantee can the law afford for the â€Å"inviolability of the body and mind† of the wife and her â€Å"marital privacy†[34] And therefore it can be safely stated that section 9 is not violative of Article 21.It also stated by critique that restitution decree serve as a stepping stone to divorce and is condemned to be a passage or passport to divorce. The reason behind the scheme of putting non consummation of marriage after one year of passing the decree of restitution of conjugal rights under sec tion 13 of the Act is that the Indian Legislature believes that there should not be a sudden break of the marriage tie. It believes in reconciliation and that that cooling-off period is not only desirable but essential. If the marriage cannot be saved even after passing the decree of restitution it must be dissolved.A factual separation gives an easily justifiable indication of breakdown. [35] That is, under the Act it serves a double purpose. It first finds the fault and where it lies. Secondly it leads to the dissolution of the marriage, if there is no resumption of cohabitation. Further, recognizing non-consumption of marriage after 1 year of passing of Restitution Decree as a ground of divorce enables the aggrieved spouse to apply to the court for maintenance under section 25; and maintenance pendente lite may also be claimed by making out a case for the same as provided in section 24.This enables a wife, who does not desire disruption of the marriage or even judicial separation from the husband, to secure provision for her support by an order of the court under the matrimonial jurisdiction conferred on it, instead of filing a suit for maintenance under the law relating to maintenance now embodied in the Hindu Adoptions and Maintenance Act 1956. [36]People who are against the concept of restitution of conjugal rights argue that England which is the nation of origin of the concept has deleted this remedy from its legislation and India is still continuing it.The Law Commission, in their Fifty-ninth Report have- not recommended its abolition nor in their Seventy-First Report of 1978. The Commission was aware that it had been abolished in England under section 20 of the Matrimonial Proceedings Act 1970. However, it is germane to state that retaining this section all these years is not without reason. The truth is that the legislature has not accepted the breakdown theory in toto, as has been accepted in England. [37] Adding on, a recent writer[38] has suggeste d that â€Å"the opinion of Derrett is more realistic and that the Hindu society is not mature enough to do away with the remedy.Its abolition would be like throwing away the baby with the bath-water. â€Å"[39]It is also argued that the methodology adopted in execution of the decree as mentioned in the Code- of Civil Procedure (0-21 Rules 32 and 33) is erroneous as it provides for financial sanction in case of non fulfillment of this decree. It is to be remembered that marriage is also contractual in nature. Providing for a financial sanction in case of non fulfillment of contractual obligation is a common practice. Also that enforcement by attachment of property is provided by court where the disobedience to such a decree is willful i. e. s deliberate, in spite of the opportunities and there are no other impediments. 0 21, Rules 31 and 32 C. P. C. provide only a financial sanction to serve as an inducement by the court to effectuate restitution and serve a social purpose i. e. p revention of the break-up of the marriage. [40]Often the case of  Russel v. Russel[41] is quoted by abolitionist, however the bigger picture as to why Lord Herschell called this remedy as barbarous is not brought in light. What he said and meant was that reasonable excuse, an essential for the decree of Restitution of Conjugal Right, was not confined only to the grounds of divorce.It can as well be â€Å"something short of legal cruelty† which might constitute a reasonable excuse for refusing restitution. What was stated by him was that if the meaning of reasonable excuse was restricted to the grounds, then this remedy shall be barbarous. This is precisely what has been taken care of in India as the history of the Act would show. Section 9(2) as originally enacted provided that â€Å"Nothing shall be pleaded in answer to a petition for restitution of conjugal rights which shall not be a ground for judicial separation or for nullity of marriage or for divorce. This created considerable difficulty. The Law Commission in its Fifty-Ninth Report recommended its deletion. It is now possible for the party to plead a reasonable excuse which may not necessarily be a ground either for judicial separation or nullity or divorce. So the Act was amended and by Act No. 68 of 1976 section 9 (2) was deleted. This brought the law in conformity with the opinion of Lord Herschell. It will, therefore, appear that Lord Herschell's expression â€Å"barbarous† was used in a different context. 42]Conclusion In summation, it may be stated that the grounds and arguments are baseless and they do not sufficiently prove that the Remedy of Restitution of Conjugal Rights is archaic, barbarous and violative of the basic Human Rights. It cannot be said that this remedy is unconstitutional. Section 9 has sufficient safeguards to prevent the marriage from being a tyranny. [43]In truth, it serves the social good purpose, by promoting reconciliation between the parties and mainten ance of matrimonial. It protects the society from denigrating. And all the years that it has been enforce it has efficiently played it's a role.References [1] Section 9 of the Hindu Marriage Act, 1955 reads as follows:- â€Å"When either the husband or the wife has without reasonable excuse withdrawn from the society of the other, the aggrieved party may apply, by a petition to the district court, for restitution of conjugal rights and the court, on being satisfied of the truth of the statements made in such petition and that there is no legal ground why the application should not be granted, may decree restitution of conjugal rights accordingly†. [2] After the Marriage Laws (Amendment) Act, 1976. [3] Paras Diwan, Law of Marriage ; Divorce, 4th Ed. p. 328. [4] T. Sareetha v. T. Venkatasubbaiah, A. I. R. 1983 A. P. 356. [5] A. I. R. 1984 Del. 66. [6] A. I. R. 1984 S. C. 1562. [7] Harvinder Kaur v Harminder Singh, A. I. R. 1984 Del. 66. [8] A. I. R. 1983 A. P. 356. [9] Jaspal S ingh, Law of Marriage and Divorce in India , (1983), p. 83. [10] (1897) AC 395. [11] A reference has been made to Mr. Prashanth S. J, Hindu Women And Restitution Of Conjugal Rights: Do We Need The Remedy [12] Kondal v. Ranganavaki, A. I. R. 1924 Mad. 49. [13] Harvinder Kaur v. Harmander Singh Choudhr, A. I. R. 1984 Del. 66. [14] Harvinder Kaur v. Harmander Singh Choudhr, A.I. R. 1984 Del. 66. [15] Linda v. Belisario (1795) 1 Hag. Con. 216(21) per Sir William Scott at pp. 30, 232. [16] Harvinder Kaur v. Harmander Singh Choudhr, A. I. R. 1984 Del. 66. [17] Harvinder Kaur v. Harmander Singh Choudhry, A. I. R. 1984 Del. 66. [18] A. I. R. 1977 S. C. 2218. [19] Dharmendra Kumar v. Usha Kumari, A. I. R. 1977 S. C. 2218. [20] T. Sareetha v. T. Venkatasubbaiah, A. I. R. 1983 A. P. 356. [21] Harvinder Kaur v. Harmander Singh Choudhry, A. I. R. 1984 Del. 66. [22] Harvinder Kaur v. Harmander Singh Choudhry, A. I. R. 1984 Del. 66. [23] 12th Vol. , 3rd Ed. , p. 284. 24] A reference may be made to Harvinder Kaur v. Harmander Singh Choudhry, A. I. R. 1984 Del. 66. [25] (1790) I Hag. Con. 144. [26] (1924) 2 Addf 382-162 E. R. 335 [27] (1865) 34 L. J. P. M;A 111 [28] (1790) I Hag. Con. 144. [29] A. I. R. 1983 A. P. 356. [30] (1924) Probate 19 (2). [31] Harvinder Kaur v. Harmander Singh Choudhry, A. I. R. 1984 Del. 66. [32] A reference may be made to Harvinder Kaur v. Harmander Singh Choudhry, A. I. R. 1984 Del. 66. [33] Mrs. Maneka Gandhi v. Union of India (UOI) and Anr, A. I. R. 1978 S. C. 597. [34] Harvinder Kaur v. Harmander Singh Choudhry, A. I.R. 1984 Del. 66. [35] Harvinder Kaur v. Harmander Singh Choudhry, A. I. R. 1984 Delhi 66. [36] S. A. Desai, Mulla Hindu Law, Vol. 2, 19th Ed. , p. 60. [37] Harvinder Kaur v. Harmander Singh Choudhry, A. I. R. 1984 Del. 66. [38] R. C. Nagpal, Modern Hindu Law, (1983), p. 110. [39] Harvinder Kaur v. Harmander Singh Choudhry, A. I. R. 1984 Del. 66. [40] Saroj Rani v. Sudharshan Kumar Chadha, A. I. R. 1984 S. C. 1562. [41] (1897) A. C. 3 95 (16). [42] Harvinder Kaur v. Harmander Singh Choudhry, A. I. R. 1984 Del. 66. [43] Saroj Rani v. Sudharshan Kumar Chadha, A. I. R. 1984 S. C. 1562. | |

Saturday, September 28, 2019

Sexual Harassment In The Workplace And Military Research Paper

Sexual Harassment In The Workplace And Military - Research Paper Example Sexual harassment in the workplace is a vocal or physical activity with sexual temperament conducted in the time of recruitment or in the workplace by the manager or the employee or any person of the concerned unit that makes the person who is receiving it, uncomfortable as it is unwelcomed and causes the individual to feel offended. It is a form of sex discrimination and it violates the ‘Title VII of 1964 Civil Rights Act’ in the United States which was amended in 1972 (Equal Rights Advocates, Inc, 2012).Sexual harassment crops up in most of the professions as well as industries. Sexual harassment can be referred as ‘organizational violation’. Certain reports have shown that majority of ethnic women are at superior threat than the white women in terms of sexual harassment as they could experience dominance from the white men (Equal Rights Advocates, Inc, 2012).Sexual harassment can be of various types such as deliberate touching, sexual looks, and gestures, sexual comment, sexual signals, gaping at someone and making sexual signals among others. Sexual harassment can depressingly affect an individual as the person may lose confidence, can get angry or can get humiliated which will lead to hampering the performance of the individual (Equal Rights Advocates, Inc, 2012). Since mixing female into male-dominated situation raises the probability of sexual harassment, the experience of female soldiers relating to sexual harassment is needed to be analyzed properly.  

Friday, September 27, 2019

Discoure Analysis Essay Example | Topics and Well Written Essays - 1000 words

Discoure Analysis - Essay Example The video shows how the power of a celebrity woman can be a reckoning force of change to the world. Angelina earns damehood with the queen for making a rare effort to contest a topic that has never been presented in the international summit (The Guardian, 2014). On the other hand, Eman Mohammed’s video on Ted Talk uncovers a gender-biased culture in Gaza. The video portrays a part of the world where a particular gender is not allowed to access certain areas. Eman is the only female photojournalist who works with male colleagues who marginalize her in the line of duty because of her gender. The video critiques unfair gender norms that exist in the community through a shocking revelation of hidden stories. Both videos depict a world that discriminates against women, but with powerful institutions that are ready to change the existing norms during a time of conflict. Both videos utilize a language that displays courage and confidence geared towards challenging the social norms existing in the world. Angelina Jolie’s gets her damehood, but she is not contented that the sexual violence is still an issue of concern in integral parts of the world. She vows to overcome international barriers by presenting in a global summit and using her celebrity figure to speak for sexual violence victims. Eman Mohammed makes a decision to appear in Ted Talk and ability to make a niche in a media career that is dominated by men. She narrates the hidden stories in the Gaza strip and exposes a community where she was bred on Ted Talk. Ted Talk is an international platform that attracts an audience from a large part of the globe. The platform does not deter her from telling the world about her challenges as a woman in her career as a photojournalist. Angelina Jolie is a female participant in the video that gets her an honorary recognition from the Queen of Birmingham. She plays the role of a sexual violence campaigner and a humanitarian for a topic that has haunted

Thursday, September 26, 2019

Confucius ( type of essay is for Literature) Example | Topics and Well Written Essays - 500 words

Confucius ( type of is for Literature) - Essay Example This also coincides with showing actual change and not merely claiming. To talk is one thing but be that change that you are aiming for is another. Actions always speak louder than words. I have come to realize that people are more akin to trusting you if they see that you are working. When one has the gift of gab, people are immediately drawn to him. But sooner or later if words are not accompanied with actions then they will see right through you. Contemplation is imperative in everything that we do. â€Å"When one cultivates to the utmost the principles of his nature, and exercises them on the principle of reciprocity, he is not far from the path. What you do not like when done to yourself, do not do to others† (Confucius, The Doctrine of the Mean, par. 29). This is no less than the golden rule. There is no doubt that this proves true in our lives. The penchant for empathy is an integral human nature that must not be dispensed with. I do not steal because I do not want to be stolen from. I know how valuable possession is for a person as I especially value my own. Even for things as simple as getting in line this is true. We all have been victims of others who have no regard and cut through a line which is why I do not do the same. â€Å"It never has been the case that what was of great importance has been slightly cared for, and, at the same time, that what was of slight importance has been greatly cared for† (Confucius, The Great Learning, par. 7). If you truly value one thing then you will pay much attention to nurture it. The same reins true for our endeavors. At the moment, the most important part of my life is my studies. I work hard to attend to all of my subjects so that I will not receive a failing grade. Although there are times that I falter, I am not easily deterred and I continue on. Because I know that this will be something of great importance

Wednesday, September 25, 2019

In the Mood for Love Essay Example | Topics and Well Written Essays - 500 words

In the Mood for Love - Essay Example Chow suggests Su to try to imagine and act in roles what occurs between their spouses and their lovers, and soon the border between a game and reality starts blurring. Su suggests Chow to help him with the book about martial arts. At the same time, as Chow and Su become closer trying to convince each other that they do not have to end like their spouses. Their relationships remain platonic. Nevertheless, the end of the movie is sad, Chow passes his days in trips across the Southeast Asia, but shortly before the end of the movie he comes back to Hong Kong, to the place where he met Su only to realize that everything had passed already and would never repeat. After that he goes to Cambodia to stay there and to leave his secret love to Su there. This movie made a serious impression on me because it raises a number of important and complicated topics. The plot is built around the adultery of the main heroes` spouses but the director deliberately avoids judging others and tagging adultery as a sin. He tries to explore how love and affection appear between man and a woman and what sexual relationships bring to both of them. Having understood that their spouses cheat on him, Su and Chaw try avoiding their destiny and decide to stay â€Å"clean†. They want their love to be honest, however it seems that they are just afraid of taking actions. In this purity Chaw and Su see their difference: their spouses are cheaters and lovers, while they have love. Though the topic of adultery is rather unpleasant the director makes all possible to show it as a background paying attention to the main scene full of delicate talks and symbols. The title of the film is very accurate: the movie shows how love evolves in people without turning into real love. The main hero at some point falls in love with the heroine, and she falls in love with him, but they do not stay together. Perhaps, it will seem absurd but Kar-wai shows that this absurd is mundane in our

Tuesday, September 24, 2019

The Joy Luck Club by Amy Tan Essay Example | Topics and Well Written Essays - 750 words

The Joy Luck Club by Amy Tan - Essay Example The historical context in which the mother lived is awesome, the miseries of war, the loss of offspring, and the issues related to coping up and adjusting to an entirely different culture! She thinks with a vengeance about the past and expects An-mei will wipe out the scars of bad memories of her life. She is not willing to settle for the ordinary success rate for her daughter; she wants her to be a prodigy. She has the latent desire that people should tell her that her daughter is so and so! In brief, she desires to be known through her daughter’s fame! She does not realize that skill can be achieved up to a certain level, but prodigies are born great and guidance is just an excuse for them. Waverly Jong’s chess genius is the case in point. Mother is unable to gauge the essential difference between the two. Waverly takes to chess as the fish takes to the water. His fascination to the game of chess is instant. Mother wants An-mei to be a piano maestro, but the poor girl is not willing to take it seriously. Waverly stumbling across an old man in the park and getting a few pointers is just an excuse, for sprouting of the latent chess genius within him. An-mei gets extensive personal training from an inept teacher, and the outcome in the competition is on the expected lines—she plays badly! An-mei is not willing to go by the dictates of her mother. She challenges her at every step and retorts, â€Å"I didn't have to do what my mother said anymore.... An-mei gets extensive personal training from an inept teacher, and the outcome in the competition is on the expected lines—she plays badly! An-mei is not willing to go by the dictates of her mother. She challenges her at every step and retorts, â€Å"I didn't have to do what my mother said anymore. I wasn't her slave. This wasn't China. I had listened to her before and look what happened. She was the stupid one,"(Amy Tan) An-mei is just not interested in following the dictates of her mother. . Earlier, mother has tried to conduct several experiments to unearth the genius in her daughter—she tries to mold her into a child actress, tries intellectual tests from popular magazines, without success. That she tries to mold her into a piano virtuoso is her final try. Mother does house cleaning services to meet the expenses of An-mei’s piano lessons and saves enough money to buy a secondhand piano for her. Even after her failure in the talent contest, mother expects her to continue practicing. This annoys the daughter and she protests bitterly, â€Å"I wish I'd never been born! I wish I were dead! Like them!† (Amy Tan)The persistent mother offers An-mei piano as the gift for her thirteenth birthday. She is shocked at the stubbornness of her mother. After her mother’s death, she accepts that gift and sits down to play it for the first time after the lapse of several years. When she discovers two parts, â€Å"Pleading Child,† and â€Å"Perfectly Contented,† of one song, she understands the big question behind the song. It hints at the inevitable tension between the two due to generation gap molded by the factors like age, ambition, experience and cultural heritage. The insistence of mothers that their children should achieve the best in life needs to be understood in

Monday, September 23, 2019

The benefits of technology in giving presentations Essay

The benefits of technology in giving presentations - Essay Example Nowhere has the development of technology had a greater impact than in the domain of communication. In the world of academia and business, the usage of proprietary software like Microsoft PowerPoint, Word, Excel and Outlook have become quite common. The PowerPoint software in particular is a potent tool in giving presentations. Students use it to present their seminars; lecturers and professors use it to impart knowledge to their students; and business executives use it to convey ideas to their team members. In this sense, one could say that the use of technology in the world of colleges and business corporations has become quite pervasive. There are some decisive advantages in using tools such as PowerPoint over conventional chalk and black board. A PowerPoint presentation can be prepared beforehand whereas someone using white chalk on black board has to write down during the lecture. Moreover, using chalk can be cumbersome and clumsy compared to using PowerPoint. For example, the latter gives the user flexibility with respect to choice of template, font size, audio-visual options, color schemes, editing facilities, etc, which are not available in conventional methods used to give presentations. An allied tool that is used alongside PowerPoint is the overhead projector. Basically, the projector helps to magnify and display the content written in the PowerPoint slide onto a large white screen. The projector also allows the presenter to use light beam as a pointing tool. Moreover, the light shed by the projector on to the screen is quite bright, making it easier for the audience to focus on the lecture. The other striking aspect of technologically powered tools such as PowerPoint is provisions made by them for customizing the content. Instead of restricting the content creator with rigid templates and formats, these tools provide a range of customizing options that can be utilized to tailor the presentation to specific needs. While the overhead

Sunday, September 22, 2019

Pro Life vs Pro Choice Essay Example for Free

Pro Life vs Pro Choice Essay â€Å"Pro Life† people that believe that for example a fetus is a human and abortion should be considered murder vs. â€Å"Pro Choice† people that for example believe its up to them and no one else a subject that has been a sensitive moral issue for people through out the entire world. The issue we currently have in hand is should abortion be allowed or not and why or why not. This issue should be looked at very carefully because it does not just effect one person it affects other people’s lives as well. There are many utilitarian’s or should we call them people that are Pro Choice out there in this world that believe that when an issue comes about, the issue when handled should offer the most positive out come not only for oneself but for others as well. When women take the time and make sure that getting an abortion is the best thing to do, some of the reasons they are considering or should be considered is; am I ready to be a mom if the conclusion is you are not ready to become a mom it could be because of what is currently going on in your life. For example, if it’s you still are in school and would like to continue your education. A very important reason one to be considered the highest is not having a supportive boyfriend or husband, you can’t do it by yourself. Some will say that they cannot afford a child at this point and time. How will you be able to feed, cloth, and shelter your child with out the necessary means? Another thing that must be considered is will the mother or child be able to survive the birth. If there is a guarantee then there should be no questions asked, if the mother wants to have an abortion then it is her right to make that decision, if she knows she could possibly die from giving birth, and she is not allowed an abortion wouldn’t that be considered suicide or murder. Judith Jarvis Thomson states, â€Å" I think that the premise is false, that the fetus is not a person from the moment of conception. A newly fertilized ovum, a newly implanted clump of cells, is no more a person than an acorn is an oak tree. But I shall not discuss any of this. For it seems to me to be of great interest to ask what happens if, for the sake of argument, we allow the premise. How, precisely, are we supposed to get from there to the conclusion that abortion is morally impermissible† (Thomson) . On the other hand people that are Pro Life will argue the fact that fetuses are human beings and it is morally wrong to take their life from them, they say that it is against god or any higher power but that argument can be considered a little â€Å"flakey†, that seems like they are telling you to be a religious person, with the possibility of so many complications it is extremely dangerous on the mothers end, there is always the option to put your child up for adoption, you should know and or trust that the state will put your infant in a good family. No society will allow any human to intentionally harm or take the life of another human being without any form of punishment, and abortion should be considered no different. Doctors and nurses promised to save our lives, not destroy them. Don Marquis of the University of Kansas asks a different question â€Å" Do we have the same reasons not to kill a fetus that we have not to kill an adult?† killing adults he says, is wrong because it deprives them of their future. But in Killing a fetus, we are also depriving it of its future. Thus, it seems inconsistent to object one but not the other.† (Marquis) We all know that there are always going to be arguments on abortion being right or wrong. Each side both has value able points that they bring up in discussion. Morally its hard to say, you can always give your opinion but it ultimately its on a personal level and no one else’s beliefs should be forced upon you. I personally believe that it should be allowed. There are more positive reasons why it should be allowed. In my opinion some of those reasons are if you know your child will be ill and not be able to take care of him or herself at all, if there is a chance the mother or child wont be able to survive the birth. However, I do not believe that only one side should be taken, it is wrong to kill a human being no matter what state they are in his or her life. If abortion was to be socially accepted then there might be safer ways to come about, or more people would want to adopt which would make it a win win for all. But what it really boils down to is it’s up to the m other and no one else, it’s her body, and her child and it should ultimately be up to her.

Saturday, September 21, 2019

He Written Articles Essay Example for Free

He Written Articles Essay Loud speech. Bravado, boasting. Overly animated or entertaining. Boisterous. Overly friendly to other guests and employees. Drinking alone. Drinking too fast. Ordering doubles. Careless with money. Urging other people to have another drink. Annoying other guests and servers. Complaining about drink prices. Complaining about drink strength or preparation. Argumentative. Aggressive or belligerent. Obnoxious or mean. Making inappropriate comments about others. Crude behavior. Inappropriate sexual advances. Foul language. Making irrational statements. Depressed or sullen. Crying or moody. Radical changes in behavior. Speaking loudly, then quietly. Drowsy. Bloodshot, glassy eyes. Slurred speech. Difficulty remembering. Slow response to questions. Spilling drinks. Rambling conversation, loss of train of thought. Trouble making change. Difficulty handling money, picking up change. Lack of focus and eye contact. Difficulty lighting a cigarette. Lighting more than one cigarette at a time. Letting a cigarette burn without smoking. Clumsy, uncoordinated. Difficulty standing up. Unusual gait. Stumbling. Bumping into things. Swaying, staggering. Unable to sit straight in chair or on bar stool. Can’t find mouth with glass. Falling down. Mussed hair. Disheveled clothing. Falling asleep. Remember, just because a person exhibits one, or even several, of these signs it does not necessarily mean that the person is intoxicated. A sober person may exhibit some of these signs as well which makes determining intoxication even more difficult. However, if a person who is drinking alcohol shows a combination of several of these signs and/or exhibits significant change(s) in behavior, the likelihood of that person being intoxicated is increased. Ultimately, you must use your own judgment to decide whether or not a person is intoxicated. These signs are intended to help you make an informed judgment, and then articulate your decision.

Friday, September 20, 2019

Strategies for Risk Management in Construction

Strategies for Risk Management in Construction 1.1 Introduction Risk management is one of the subfields on nine knowledge area in project management. Risk management is about managing uncertainty that inherent in most projects that require formal project management, using ‘uncertainty in the plain English ‘lack of certainty sense. Risk management also refer to a series of processes which are required for the identification, analysis, and reaction towards the projects risk in order to maximize the effects of positive uncertainty even and minimize the consequences of negative uncertainty even. Risk management also been organise in developed countries. This due to the risk management is better applied in the developed countries. Comparing with other countries with various situations, Malaysia is a developing country which the politic, economy, social and technology have mad specific risks especially related. Unfortunately, in Malaysia, the management of risk is not so systematic and requires more research and development. Malaysia seems to be developing countries because the demand for founding infrastructures is highly increasing. Currently, the government is enforcing the development plan. National economic will be burden if the plan is falling behind. This means that it is important to recognise the risks that endanger the plan. A lot of budget was spent on investment in the construction industry. The application of risk management will result in taking correct, regulated, and prompt decision through being informed about the environment despite the complication and changes in the construction industries. 1.2 Problem Statement Knowing the environment and be capable in decision making in a prompt and correct manner is the key to success in managing todays challenge and risk imminent. In case of not recognise both internal and external risks factor of the project, the managerial decision-making error will take place. Moreover, it will cause problems in time and cost assessment forecasting. Through risk management, it can identify the risk generating factor and control or remove such risk factors through analyzing and choosing the suitable action. As one of the subfields in the nine knowledge area of project management, risk management is still being paid less attention in Malaysia. In very few organisations, employers or contractors can be seen who have a proper insight into risk management. There are no any practical guidelines to be properly implemented for risk management in this industry. Furthermore, as a result of lack of binding regulations, current regulations cannot force construction parties to undertake risk management. So, by adopting scientific approach to risk management, introducing its process and eventually its compliance with existing realities in development plans, particularly in project are a necessity. The issue of risk management was for the first time raised in mid-1990s in the United States. Laws and regulations for applying risk management in projects have now been adopted. Since risk management is a new field, except for several seminars and universities research project, applied research has not taken place in risk management in Malaysia. 1.3 Research Questions i. What kind of risks occurs in the construction projects and what are their factors? ii. What are the strategies that been applied in dealing with risk? 1.4 Research Objectives i. To identify risk factors in construction industry. ii. To identify strategies of risk management applied in construction industry. 1.5 Scope of Study This research is focuses on the implementation of risk management in the Malaysia construction industry. Therefore, the scope of this study is only limited in Pahang where respondents have been chosen randomly out of this area. Moreover, the respondents comprised of contractors registering in Grade 7. The reasons for being such is that the categorization of the grade of contractors reflect, to a great extent, the size of project that being executed in the company and the size of the company. Grade 7 of contractors is regarded as big companies with large-size projects. Depending on their size of project and their company, the risk that they encounter will differ. As a result of this, to make sure the data obtained could be reliable, its necessary to limit the respondents based on the size of project and company. 1.6 Expected Findings This research will achieve some precious advantages. First is to enhance the consciousness of different key personnel of project resulting in performing the project reliably while considering issues like risk management in general management project. To accomplish this, its essential to implement theoretical concepts mentioned in numerous literatures in reality. This can guarantee a well project management through attempting to prevent from normal issues in projects like poor quality of products, cost overrun, and delays. CHAPTER 2 LITERATURE REVIEW 2.1 Introduction Risk will bring effect on the project cost, time, and scope. This chapter covers the construction project risks. All the risks will be recognised and categories into a number of group. Then, the current trend in risk management researches would be considered. In order to meet the first objective, identification and classification the strategies used by the project manager used to avoid the risk in their project. The second objective will be fulfilling through identification and classification of risk factor in construction projects. 2.2 Definitions 2.2.1 Risk Risk is an uncertain event or condition that, if it occurs, it can bring a positive or negative effect on a project objective (PMBOOK, 2000). Risk also can be defined as an uncertain event or set of circumstances if it occur, it will give effect on the achievement of the projects objectives (APM, 1997). This definition is widely use and gather welcoming upside and unwelcome downside effects. This definition works in theory but fails in practice. In this study, the effect of risk in construction project is through the way of integrated method, namely size of consequences and probabilities of happening have been measured. In the construction project, there is a lot of risk in every phase. This is the norm of any project not only in construction project. Construction firms want to have projects at international level. In every construction project, risks are present. Risks in international construction projects are more critical as compared to domestic projects especially when developin g countries are involved. That is the reason risk is desirable for international construction firms who want to do construction projects in foreign country, to identify the risks as early as possible, so that suitable strategies can be made for the penetration in to the foreign construction market and to manage these risks before the actual execution of projects on international level. Risk consequences in construction projects may reach an undesirable level because of inadequate resources and lack of advancements in technologies, therefore a thorough awareness and identification of risks is essential to prepare suitable strategies. International construction projects have many risks involved due to the nature of their structure. There are more parties involved and more phases are present in international construction projects than a conventional construction project. Each party has its different objectives. This difference in the objectives of parties leads to conflict of interest which is a root cause of risks in international construction projects. 2.2.2 Risk Factor Construction project is divided into separate phases. At the end of each phase, appraisal can be made and assessment of risk involved in proceeding with the project. The management of risk therefore a continue process and should span all the phases of the project. Since project risks are dynamic, a risk assessment must be carried out at the end of each phase prior to proceeding to the next phase. In fact, active management of risk must continue between the review points until the project is complete. Risk can also change during a phase. The result is a complete re-appraisal may need to be performed. There is a generic acknowledgement that human factors are the most important element that affects the project success. According to (Lynch, 2002), human factors bring affect to project success. A series of errors by a steel contractor lead to a near miss at Canary Wharf when a two-tonne pre-cast staircase fell from a crane and landed on the ground metres from a crowded side office. It was reported that the stairs fell when the left side eyebolt lifting pin of the staircase lifting gear came free. The load was transfer to the right-hand bolt, causing it ti shear. The report confirmed that the eyebolt was not correctly inserted. Independent testing agency Lloyds British examined key parts of the lifting equipment and concludes that the equipment would be sufficient had it been assembled correctly. Shortfalls in the firms arrangement at the site were criticised. No risk assessment or method statement had been drawn up specifically for the lifting operation and key decision were left to operators who were not trained to use eyebolt. All these shortcomings fall in sphere of human factors as defined earlier. 2.2.2 Risk Management Risk management is widely use by the companies or organizations to ensure the control of risk in the business process. In this research, the simplest possible approach to describe the risk management process is chosen due to the context of the construction sector. According to (Norman, 1993) risk management is a system use to identify and quantify all risk to a business or project that is exposed so that conscious decision can be taken on the way to manage the risk. Risk management also been mention in the PMBOOK as one of the nine areas of project management and has been illustrated as the process concerned with conducting risk management planning, identification, analysis, responses, and monitoring, and control on a project. 2.2.3 Fundamentals of Risk Management There are a lot of risks in the construction projects, and there is no standard method that can explain about the risk management. According to (Telford, 1998) risk in construction industry is the existence of real or possible chances or dangers affecting projects objective while commissioning or operating the project. According to (J. Walewski, 2002) , risks can be categories into two parts. The first part is pure risk when there is the possibility of financial gain. The second part is speculative risk that includes the possibility of both gains and losses. 2.3 Risk Management Process Project Risk Management involves procedure considering executing risk management planning, identification, analysis, response and monitoring, and control on a project. This procedure can update the majority of the project. Project risk management aims to enhance the possibility and effect of positive event, and reduce the possibility and effect of negative incident to the project. According to the Project Management Body of Knowledge, (PMBOOK, A guide to the project management body of knowledge, 2004), the Project Risk Management Process 2.3.1 Risk Identification Risk identification has two types which are prescriptive and creative. These two types of risk identification has their own function but they must be cautiously handled in order to make sure the process of identifying risk is economic. The result in the utilization of checklists of standard risk distinguished to appear in a special context when there is an attempt to modify the risk identification. Even though checklist is fast to make, but it is inclines to prepare the anticipations of the engaged, and the identification of risks going beyond the experience summarized in the list. The result of using the checklist method can be high, but if they are to have a function, it suggest that they better retained for examining the identification process, and make sure there is no familiar issues have been skipped or ignored. Brainstorming is another method that being hold in a group and it is the favoured method. This is a little more challenging for the participants compared to checklist method but the brainstorming seems more efficient. Brainstorming predict the identification process to gain inspiration from the wide capacity of the participants, due to decreasing the risk that is inadequate consideration will be given to new and more emergent issues, as can occur with the checklist method. 2.3.3 Risk Analysis The risk analysis is implement in each risk as significance rating structure that is considering any existent factors that might be occur which will function to check the risk. The risk analysis can be implementing with qualitative impact and likelihood scale and a matrix clarifying the significance of different composition of the risk. When risks are complicated by themselves that possibly includes various related impacts and events, some types of modelling might be essential. The significance of a risk is connected to a well explained event that will be a composition of the impact and likelihood of the risks. The significance of an unsure quantity will be a function of its three type of value which are the maximum, minimum, and most likely values. 2.3.4 Risk Evaluation Risk can be occurring in any situation. When there are just a lot of risks at the work, the evaluation phase may be proportionately simple and easy. On the other hand, it is a critical step for obtaining an accepted view of the proportionate of the recognized risks. Risk evaluation takes the primary analysis and examines the risks that occur towards the companys known preferences. Any risks which is too high or too low significance are adapted, with a record of the fact being hold for the purpose of tracking. 2.3.5 Risk Treatment Risk treatment comprises what should be done in order to give reaction to recognized risks. Any plans which were thought of before the risk management process commenced are enlarged with actions that been taken to manage the risks before they occur and providing contingency plans with which to get back if a risk happen. 2.3.6 Monitoring and Review In monitoring and review ingredient of the process, there are two levels of them. The other five steps must be remained under an examination as the time passes. Finding of better information may make the first evaluation out of date. It is now usually essential to start the whole process or repeat it once again when risks occurs, not until the change is especially deep, but those parts which are immediately influenced by changing occasions should be updated from time to time. The second step is the monitoring of the performance of the other five levels. The implementation of the risk management process attracts sources and should be administered in order to make sure that it is performed cost-effectively. 2.3.7 Communication and Consultation Communication and consultation is the key component of the risk management process and a major beneficial side effect. Risk management is success when it achieves a high level of creative input and involving all parties with a role to play in achieving a successful outcome for the project or business process being addressed. In both the planning and execution phase in the risk management process, it is prominent to make sure all those individuals who need to be involved are given adequate opportunity to do so and are kept informed of developments in the understanding of risks and the measurement taken to deal with them. 2.4 Tools and Techniques for Risk Response Planning In every project, the risks can raise when there are a lot of phases and tasks to be done in such a way that the least consideration is delivered to main issues of the project. According to (Bajaj, 2000), individual members of the project are usually focus only on the role that they have in the project risks and voluntarily or involuntarily try to pass these risks on to other project members. This means they do not want to take the responsibility to handle the risk by themselves. The crucial part of risk management is mitigating risk by minimize their effects. A systematic risk management strategy which is executed properly shall decrease the adverse effects. Risk mitigation that been properly planned and well managed is a replacement of uncertain and volatile events with a more predictable or controlled response ( (Chapman, 2002). A proper risk mitigation strategy is very important in order to reduce the likelihood of happening or possible influence and doubtfulness of a risk event. There are four types of risk management strategy which are: i. Risk avoidance which when a risk is not accepted and other lower risk choices are available from several alternatives; ii. Risk acceptance which when a conscious decision is made to accept the outcomes the event should occur; iii. Risk control which when a process of sequentially monitoring and improving the situation on the project is used. This process includes the development of a risk reduction plan and then pursuing the plan. This means that mitigation strategy is the most common risk management and handling technique; iv. Risk transfer which when the risk is shared with others. Sharing the risk with others involve contractual shifting, performance encouragement, insurance, warranties, bonds, and so on. 2.5 Classification of Risks in Construction The first stage in risk management is risk identification. Risk identification is recognising any risks that can be occur in the construction projects. Risk classification is one of the part in risk identification which is the trying to manage different risks that can give impact and influence a construction project. According to (Chapman, 2001), risk has four subcategories which are project, industry, client, and environment. From the other related literature, out of 58 risks recognized connected to construction joint ventures, (Shen, 2001) categorised them in 6 groups according to risks nature like financial, economy, technical, politic, and management. As a result, there are a lot of methods that can be use to categorizing risks that can affect to construction projects. According to other study by (Kalayjian, 2000), in the Third World of Construction classified that some of the most representative kinds of risks that are commonly use in todays global construction area are: i. Financial Risk is the economic feasibility in a project that relies on its capital organizing and capacity to draw dependable resources of financing at logical terms. Risks contain the owners power of acquiring enough budgets, deposit payment, receive tax incentives, and expect instability of currency exchange rates. ii. Design and Construction Risk which is in the construction project itself. To be success in construction projects, the managerial teams must have a power decision making. Risks that must be take care are an effective team selection process, obtaining permits and third party concurrence in timely fashion, procurement of adequate labour, materials and equipment, monitoring all changes in project scope, quality control assurance, and ensuring overall compliance with contractual obligations. iii. Weather and Environmental Risk is about the mother nature situation. In construction sites, there is vulnerable change in the weather and natural disaster like earthquakes, monsoons, and flood. Other risk can be reducing the other dangerous wastes and severe environmental legislation. iv. Economic and political risk is a risk which also can affect the construction project. The performance of economic in a country and political stability has a significant effect in construction activity and investment. Prominent risks consist of financial policy and governmental monetary responsibility, resources availability, development of infrastructures, internal stability, changes in managerial schedule, and political management. On the other research done by (Hassanein, 2007), there are several risk that has been identified which are: i. financial risks: the checklist mentioned about some financial risks which are related to the projects in this study. ii. Technical risks: the checklist show allowances for similar standards and codes. This is because the two projects studied were tendered internationally which causes contractors from different countries. iii. Risk related to change: the checklist addressed certain provisions concerning the simultaneous progress of design and construction phases on the two fast track project under study. iv. Consortium risk: in some contracts, contractors are requested to make partnership including foreign and local contractors as a necessity of tendering qualification. v. Owner obligation risks: the checklist embraced factors which should be stated in the contract to clarify owners responsibilities and to guarantee these responsibilities would be come up with on time. These include an obvious interpretation of these responsibilities, time frame for their execution and declaration of amendments if these responsibilities are not executed shall be contained in the contracts. vi. Risks regarding interface with other contractors: the checklist included specific items to mitigate risks related to interfaces with other contractors. vii. Risks regarding interface with other contractors: the checklist included specific items to mitigate risks related to interfaces with other contractors. According to (Tang, 2007), the most important risks in project are poor quality of work, premature failure of the facility, safety, financial, and incorrect design risk. 2.7 Barriers of Implementation of Risk Management According to (Liu, 2007), the most dominant risk in the construction industry is the unsupportive culture within the industry. As a result, the lack of proficiency and experience is the general reluctance for implementation of risk management in the Chinas construction industry. Lack of proficiency and experience causes contractors to be unable to identify the significance and advantages of risk management. To improve the low understanding towards risk is through changing the culture of enterprise. This is because it is essential for Chinese contractors to agree with the risk managements concept as well as execute risk management techniques. The professionals behaviour seems the most significant issue affecting the improvement of risk management in the Chinese construction industry. Organizational learning becomes the critical element of an incorporated risk management procedure which being the learning structure formed to assist Chinese contractors in developing their performance an d knowledge towards risk management. In fact, to transform the modern knowledge to their own knowledge using organizational learning seems become the critical issue for Chinese contractors in order to develop their ambitious. According to (Baloi, 2003), it appears that professionals have not completely understood the value of risk management. This is because there are advances in the methods of risk management and availability of the enormous body of knowledge of risk management. The professionals recognised language, implementation costs, and educational barriers and a fear of change to be the principal barriers of the efficient conformance. According to (Hlaing, 2008), Singapore construction contractors on construction risk identification asserted that the reason that preventing the implementation of risk management process is money but it is not the major constraint for implementing risk management program for the companies but the most important risk in the list is lack of time. This is same as stated by (Lyons, 2004), identified that time constraint is a main restriction. The activities of construction industry are really related to time when the manufacture of the construction is basically used just-in-time for the manufacture need of customer. 2.8 Risk Identification Methods In order to be successful in project management, it requires the ability to predict the risks that affecting the project scope, time, and cost. However, there are a lot of researches about risk identification, risk assessment, and management for executed facilities is focusing on types of projects or categories of risks aspects. It is related to the literature from (Howell, 2001) about the political risks that exist. Now a day, the construction industry still cannot identify the risks that occur in the project activities. According to (Walewski, 2002), the worth of systematic risk management of activities on project has not been identified. This is because the lack of common vision about risk and the parties that involved in construction industry such as owners, designers, investors, and contractors have different objectives and the relationship among them are prevalent contradict. All of the project parties not systematically make their efforts at organizing risk analysis management among themselves and this particularly correct between contractors and owners. (Fang, 2004) show a model for risk assessment. The model use for tendering project in Chinese building project based on assessment and identification of critical risks in the Chinese construction industry. As a result, the projects risk could be evaluated by analyzing the issues such as the competition for tendering and reasonableness of bid price, lack of cooperation between contractors and the owner. In other study done by (Hassanein, 2007), the marked lack of consistency in the contractors risk identification effort been identified as the risk in the power station projects on Egypt. The contractors who have more experience in Egypt were better to identify the relevant risk. Vice versa, the local Egyptian contractors who have vast experience in Egypt but limited project management experience were not really expert to properly identify risks and to take the appropriate exceptions. In fact, the bidders do not include in their proposals on their true lists of exceptions which represent genuine risks to them. CHAPTER 3 RESEARCH METHODOLOGY 3.1 Introduction This chapter will cover how the research will conduct to achieve the objectives of this study. The methodology that will be use are questionnaire survey among the Pahang construction professionals, and preliminary interviews with experts will carry out. The steps are as follows: 3.2 Data Collection 3.2.1 Interview Interview is the effective procedure of data collection because the actuality of condition could be perceived specifically and comprehensively while conducting the interview. For the purpose of this study, as the scope of this study is limited to Pahang, the interview sessions will conduct through two main ways which are telephone interview as well as email interview through the internet. 3.2.2 Questionnaire Questionnaire survey is one of the others way of data collection carry out among selected construction practitioners involve in construction projects. This specialist will working in contractor construction companies. The questionnaire will be identified from interview with construction practitioners and through literature review. The survey questionnaire will administer through e-mail and fax, and postal questionnaire, and secondly through the distribution to selected contractors which are project managers, managing directors, chairman, and head of technical departments operating in the Pahang construction industry. 3.3 Data Analysis All returned questionnaire will be check from completeness and suitability for use in statistical analysis. Next, all the data collected from the questionnaire will be analyse with the assistance of statistical software program called Statistical Package for Social Science (SPSS). After putting the data in SPSS software program, some statistical method will be apply to the data through frequency analysis and mean index, risk analysis matrix, and single sample T-test. After putting questionnaire data into SPSS, some statistical method will be applied to the using frequency analysis and mean index, risk analysis matrix, and correlation test. 3.4 Measurement Most of the question will applied using five point of Likert scale, and other question will applied with multiple choice. The most common scale that will be use is 1 to 5. There are three sections in the questionnaire. Section A will cover about the level of risk in construction project. Participant will be given three choices of answer which is low, medium, and high to scale the risk level according to their perspective. In section B, the typical Likert scale take the following format: Risk level Rare Unlikely Possible Likely Almost certain Score 1 2 3 4 5 Table 3.1: Risk factors In section C, the respondent will be asked to choose the scale between 1 to 5. The scale 1 shows a condition which the probability of strategies been use is minor where scale 5 means the maximum probability of risk strategies usage. Strategies Not important Little important Average Important Very important Score 1 2 3 4 5 Strategies for Risk Management in Construction Strategies for Risk Management in Construction 1.1 Introduction Risk management is one of the subfields on nine knowledge area in project management. Risk management is about managing uncertainty that inherent in most projects that require formal project management, using ‘uncertainty in the plain English ‘lack of certainty sense. Risk management also refer to a series of processes which are required for the identification, analysis, and reaction towards the projects risk in order to maximize the effects of positive uncertainty even and minimize the consequences of negative uncertainty even. Risk management also been organise in developed countries. This due to the risk management is better applied in the developed countries. Comparing with other countries with various situations, Malaysia is a developing country which the politic, economy, social and technology have mad specific risks especially related. Unfortunately, in Malaysia, the management of risk is not so systematic and requires more research and development. Malaysia seems to be developing countries because the demand for founding infrastructures is highly increasing. Currently, the government is enforcing the development plan. National economic will be burden if the plan is falling behind. This means that it is important to recognise the risks that endanger the plan. A lot of budget was spent on investment in the construction industry. The application of risk management will result in taking correct, regulated, and prompt decision through being informed about the environment despite the complication and changes in the construction industries. 1.2 Problem Statement Knowing the environment and be capable in decision making in a prompt and correct manner is the key to success in managing todays challenge and risk imminent. In case of not recognise both internal and external risks factor of the project, the managerial decision-making error will take place. Moreover, it will cause problems in time and cost assessment forecasting. Through risk management, it can identify the risk generating factor and control or remove such risk factors through analyzing and choosing the suitable action. As one of the subfields in the nine knowledge area of project management, risk management is still being paid less attention in Malaysia. In very few organisations, employers or contractors can be seen who have a proper insight into risk management. There are no any practical guidelines to be properly implemented for risk management in this industry. Furthermore, as a result of lack of binding regulations, current regulations cannot force construction parties to undertake risk management. So, by adopting scientific approach to risk management, introducing its process and eventually its compliance with existing realities in development plans, particularly in project are a necessity. The issue of risk management was for the first time raised in mid-1990s in the United States. Laws and regulations for applying risk management in projects have now been adopted. Since risk management is a new field, except for several seminars and universities research project, applied research has not taken place in risk management in Malaysia. 1.3 Research Questions i. What kind of risks occurs in the construction projects and what are their factors? ii. What are the strategies that been applied in dealing with risk? 1.4 Research Objectives i. To identify risk factors in construction industry. ii. To identify strategies of risk management applied in construction industry. 1.5 Scope of Study This research is focuses on the implementation of risk management in the Malaysia construction industry. Therefore, the scope of this study is only limited in Pahang where respondents have been chosen randomly out of this area. Moreover, the respondents comprised of contractors registering in Grade 7. The reasons for being such is that the categorization of the grade of contractors reflect, to a great extent, the size of project that being executed in the company and the size of the company. Grade 7 of contractors is regarded as big companies with large-size projects. Depending on their size of project and their company, the risk that they encounter will differ. As a result of this, to make sure the data obtained could be reliable, its necessary to limit the respondents based on the size of project and company. 1.6 Expected Findings This research will achieve some precious advantages. First is to enhance the consciousness of different key personnel of project resulting in performing the project reliably while considering issues like risk management in general management project. To accomplish this, its essential to implement theoretical concepts mentioned in numerous literatures in reality. This can guarantee a well project management through attempting to prevent from normal issues in projects like poor quality of products, cost overrun, and delays. CHAPTER 2 LITERATURE REVIEW 2.1 Introduction Risk will bring effect on the project cost, time, and scope. This chapter covers the construction project risks. All the risks will be recognised and categories into a number of group. Then, the current trend in risk management researches would be considered. In order to meet the first objective, identification and classification the strategies used by the project manager used to avoid the risk in their project. The second objective will be fulfilling through identification and classification of risk factor in construction projects. 2.2 Definitions 2.2.1 Risk Risk is an uncertain event or condition that, if it occurs, it can bring a positive or negative effect on a project objective (PMBOOK, 2000). Risk also can be defined as an uncertain event or set of circumstances if it occur, it will give effect on the achievement of the projects objectives (APM, 1997). This definition is widely use and gather welcoming upside and unwelcome downside effects. This definition works in theory but fails in practice. In this study, the effect of risk in construction project is through the way of integrated method, namely size of consequences and probabilities of happening have been measured. In the construction project, there is a lot of risk in every phase. This is the norm of any project not only in construction project. Construction firms want to have projects at international level. In every construction project, risks are present. Risks in international construction projects are more critical as compared to domestic projects especially when developin g countries are involved. That is the reason risk is desirable for international construction firms who want to do construction projects in foreign country, to identify the risks as early as possible, so that suitable strategies can be made for the penetration in to the foreign construction market and to manage these risks before the actual execution of projects on international level. Risk consequences in construction projects may reach an undesirable level because of inadequate resources and lack of advancements in technologies, therefore a thorough awareness and identification of risks is essential to prepare suitable strategies. International construction projects have many risks involved due to the nature of their structure. There are more parties involved and more phases are present in international construction projects than a conventional construction project. Each party has its different objectives. This difference in the objectives of parties leads to conflict of interest which is a root cause of risks in international construction projects. 2.2.2 Risk Factor Construction project is divided into separate phases. At the end of each phase, appraisal can be made and assessment of risk involved in proceeding with the project. The management of risk therefore a continue process and should span all the phases of the project. Since project risks are dynamic, a risk assessment must be carried out at the end of each phase prior to proceeding to the next phase. In fact, active management of risk must continue between the review points until the project is complete. Risk can also change during a phase. The result is a complete re-appraisal may need to be performed. There is a generic acknowledgement that human factors are the most important element that affects the project success. According to (Lynch, 2002), human factors bring affect to project success. A series of errors by a steel contractor lead to a near miss at Canary Wharf when a two-tonne pre-cast staircase fell from a crane and landed on the ground metres from a crowded side office. It was reported that the stairs fell when the left side eyebolt lifting pin of the staircase lifting gear came free. The load was transfer to the right-hand bolt, causing it ti shear. The report confirmed that the eyebolt was not correctly inserted. Independent testing agency Lloyds British examined key parts of the lifting equipment and concludes that the equipment would be sufficient had it been assembled correctly. Shortfalls in the firms arrangement at the site were criticised. No risk assessment or method statement had been drawn up specifically for the lifting operation and key decision were left to operators who were not trained to use eyebolt. All these shortcomings fall in sphere of human factors as defined earlier. 2.2.2 Risk Management Risk management is widely use by the companies or organizations to ensure the control of risk in the business process. In this research, the simplest possible approach to describe the risk management process is chosen due to the context of the construction sector. According to (Norman, 1993) risk management is a system use to identify and quantify all risk to a business or project that is exposed so that conscious decision can be taken on the way to manage the risk. Risk management also been mention in the PMBOOK as one of the nine areas of project management and has been illustrated as the process concerned with conducting risk management planning, identification, analysis, responses, and monitoring, and control on a project. 2.2.3 Fundamentals of Risk Management There are a lot of risks in the construction projects, and there is no standard method that can explain about the risk management. According to (Telford, 1998) risk in construction industry is the existence of real or possible chances or dangers affecting projects objective while commissioning or operating the project. According to (J. Walewski, 2002) , risks can be categories into two parts. The first part is pure risk when there is the possibility of financial gain. The second part is speculative risk that includes the possibility of both gains and losses. 2.3 Risk Management Process Project Risk Management involves procedure considering executing risk management planning, identification, analysis, response and monitoring, and control on a project. This procedure can update the majority of the project. Project risk management aims to enhance the possibility and effect of positive event, and reduce the possibility and effect of negative incident to the project. According to the Project Management Body of Knowledge, (PMBOOK, A guide to the project management body of knowledge, 2004), the Project Risk Management Process 2.3.1 Risk Identification Risk identification has two types which are prescriptive and creative. These two types of risk identification has their own function but they must be cautiously handled in order to make sure the process of identifying risk is economic. The result in the utilization of checklists of standard risk distinguished to appear in a special context when there is an attempt to modify the risk identification. Even though checklist is fast to make, but it is inclines to prepare the anticipations of the engaged, and the identification of risks going beyond the experience summarized in the list. The result of using the checklist method can be high, but if they are to have a function, it suggest that they better retained for examining the identification process, and make sure there is no familiar issues have been skipped or ignored. Brainstorming is another method that being hold in a group and it is the favoured method. This is a little more challenging for the participants compared to checklist method but the brainstorming seems more efficient. Brainstorming predict the identification process to gain inspiration from the wide capacity of the participants, due to decreasing the risk that is inadequate consideration will be given to new and more emergent issues, as can occur with the checklist method. 2.3.3 Risk Analysis The risk analysis is implement in each risk as significance rating structure that is considering any existent factors that might be occur which will function to check the risk. The risk analysis can be implementing with qualitative impact and likelihood scale and a matrix clarifying the significance of different composition of the risk. When risks are complicated by themselves that possibly includes various related impacts and events, some types of modelling might be essential. The significance of a risk is connected to a well explained event that will be a composition of the impact and likelihood of the risks. The significance of an unsure quantity will be a function of its three type of value which are the maximum, minimum, and most likely values. 2.3.4 Risk Evaluation Risk can be occurring in any situation. When there are just a lot of risks at the work, the evaluation phase may be proportionately simple and easy. On the other hand, it is a critical step for obtaining an accepted view of the proportionate of the recognized risks. Risk evaluation takes the primary analysis and examines the risks that occur towards the companys known preferences. Any risks which is too high or too low significance are adapted, with a record of the fact being hold for the purpose of tracking. 2.3.5 Risk Treatment Risk treatment comprises what should be done in order to give reaction to recognized risks. Any plans which were thought of before the risk management process commenced are enlarged with actions that been taken to manage the risks before they occur and providing contingency plans with which to get back if a risk happen. 2.3.6 Monitoring and Review In monitoring and review ingredient of the process, there are two levels of them. The other five steps must be remained under an examination as the time passes. Finding of better information may make the first evaluation out of date. It is now usually essential to start the whole process or repeat it once again when risks occurs, not until the change is especially deep, but those parts which are immediately influenced by changing occasions should be updated from time to time. The second step is the monitoring of the performance of the other five levels. The implementation of the risk management process attracts sources and should be administered in order to make sure that it is performed cost-effectively. 2.3.7 Communication and Consultation Communication and consultation is the key component of the risk management process and a major beneficial side effect. Risk management is success when it achieves a high level of creative input and involving all parties with a role to play in achieving a successful outcome for the project or business process being addressed. In both the planning and execution phase in the risk management process, it is prominent to make sure all those individuals who need to be involved are given adequate opportunity to do so and are kept informed of developments in the understanding of risks and the measurement taken to deal with them. 2.4 Tools and Techniques for Risk Response Planning In every project, the risks can raise when there are a lot of phases and tasks to be done in such a way that the least consideration is delivered to main issues of the project. According to (Bajaj, 2000), individual members of the project are usually focus only on the role that they have in the project risks and voluntarily or involuntarily try to pass these risks on to other project members. This means they do not want to take the responsibility to handle the risk by themselves. The crucial part of risk management is mitigating risk by minimize their effects. A systematic risk management strategy which is executed properly shall decrease the adverse effects. Risk mitigation that been properly planned and well managed is a replacement of uncertain and volatile events with a more predictable or controlled response ( (Chapman, 2002). A proper risk mitigation strategy is very important in order to reduce the likelihood of happening or possible influence and doubtfulness of a risk event. There are four types of risk management strategy which are: i. Risk avoidance which when a risk is not accepted and other lower risk choices are available from several alternatives; ii. Risk acceptance which when a conscious decision is made to accept the outcomes the event should occur; iii. Risk control which when a process of sequentially monitoring and improving the situation on the project is used. This process includes the development of a risk reduction plan and then pursuing the plan. This means that mitigation strategy is the most common risk management and handling technique; iv. Risk transfer which when the risk is shared with others. Sharing the risk with others involve contractual shifting, performance encouragement, insurance, warranties, bonds, and so on. 2.5 Classification of Risks in Construction The first stage in risk management is risk identification. Risk identification is recognising any risks that can be occur in the construction projects. Risk classification is one of the part in risk identification which is the trying to manage different risks that can give impact and influence a construction project. According to (Chapman, 2001), risk has four subcategories which are project, industry, client, and environment. From the other related literature, out of 58 risks recognized connected to construction joint ventures, (Shen, 2001) categorised them in 6 groups according to risks nature like financial, economy, technical, politic, and management. As a result, there are a lot of methods that can be use to categorizing risks that can affect to construction projects. According to other study by (Kalayjian, 2000), in the Third World of Construction classified that some of the most representative kinds of risks that are commonly use in todays global construction area are: i. Financial Risk is the economic feasibility in a project that relies on its capital organizing and capacity to draw dependable resources of financing at logical terms. Risks contain the owners power of acquiring enough budgets, deposit payment, receive tax incentives, and expect instability of currency exchange rates. ii. Design and Construction Risk which is in the construction project itself. To be success in construction projects, the managerial teams must have a power decision making. Risks that must be take care are an effective team selection process, obtaining permits and third party concurrence in timely fashion, procurement of adequate labour, materials and equipment, monitoring all changes in project scope, quality control assurance, and ensuring overall compliance with contractual obligations. iii. Weather and Environmental Risk is about the mother nature situation. In construction sites, there is vulnerable change in the weather and natural disaster like earthquakes, monsoons, and flood. Other risk can be reducing the other dangerous wastes and severe environmental legislation. iv. Economic and political risk is a risk which also can affect the construction project. The performance of economic in a country and political stability has a significant effect in construction activity and investment. Prominent risks consist of financial policy and governmental monetary responsibility, resources availability, development of infrastructures, internal stability, changes in managerial schedule, and political management. On the other research done by (Hassanein, 2007), there are several risk that has been identified which are: i. financial risks: the checklist mentioned about some financial risks which are related to the projects in this study. ii. Technical risks: the checklist show allowances for similar standards and codes. This is because the two projects studied were tendered internationally which causes contractors from different countries. iii. Risk related to change: the checklist addressed certain provisions concerning the simultaneous progress of design and construction phases on the two fast track project under study. iv. Consortium risk: in some contracts, contractors are requested to make partnership including foreign and local contractors as a necessity of tendering qualification. v. Owner obligation risks: the checklist embraced factors which should be stated in the contract to clarify owners responsibilities and to guarantee these responsibilities would be come up with on time. These include an obvious interpretation of these responsibilities, time frame for their execution and declaration of amendments if these responsibilities are not executed shall be contained in the contracts. vi. Risks regarding interface with other contractors: the checklist included specific items to mitigate risks related to interfaces with other contractors. vii. Risks regarding interface with other contractors: the checklist included specific items to mitigate risks related to interfaces with other contractors. According to (Tang, 2007), the most important risks in project are poor quality of work, premature failure of the facility, safety, financial, and incorrect design risk. 2.7 Barriers of Implementation of Risk Management According to (Liu, 2007), the most dominant risk in the construction industry is the unsupportive culture within the industry. As a result, the lack of proficiency and experience is the general reluctance for implementation of risk management in the Chinas construction industry. Lack of proficiency and experience causes contractors to be unable to identify the significance and advantages of risk management. To improve the low understanding towards risk is through changing the culture of enterprise. This is because it is essential for Chinese contractors to agree with the risk managements concept as well as execute risk management techniques. The professionals behaviour seems the most significant issue affecting the improvement of risk management in the Chinese construction industry. Organizational learning becomes the critical element of an incorporated risk management procedure which being the learning structure formed to assist Chinese contractors in developing their performance an d knowledge towards risk management. In fact, to transform the modern knowledge to their own knowledge using organizational learning seems become the critical issue for Chinese contractors in order to develop their ambitious. According to (Baloi, 2003), it appears that professionals have not completely understood the value of risk management. This is because there are advances in the methods of risk management and availability of the enormous body of knowledge of risk management. The professionals recognised language, implementation costs, and educational barriers and a fear of change to be the principal barriers of the efficient conformance. According to (Hlaing, 2008), Singapore construction contractors on construction risk identification asserted that the reason that preventing the implementation of risk management process is money but it is not the major constraint for implementing risk management program for the companies but the most important risk in the list is lack of time. This is same as stated by (Lyons, 2004), identified that time constraint is a main restriction. The activities of construction industry are really related to time when the manufacture of the construction is basically used just-in-time for the manufacture need of customer. 2.8 Risk Identification Methods In order to be successful in project management, it requires the ability to predict the risks that affecting the project scope, time, and cost. However, there are a lot of researches about risk identification, risk assessment, and management for executed facilities is focusing on types of projects or categories of risks aspects. It is related to the literature from (Howell, 2001) about the political risks that exist. Now a day, the construction industry still cannot identify the risks that occur in the project activities. According to (Walewski, 2002), the worth of systematic risk management of activities on project has not been identified. This is because the lack of common vision about risk and the parties that involved in construction industry such as owners, designers, investors, and contractors have different objectives and the relationship among them are prevalent contradict. All of the project parties not systematically make their efforts at organizing risk analysis management among themselves and this particularly correct between contractors and owners. (Fang, 2004) show a model for risk assessment. The model use for tendering project in Chinese building project based on assessment and identification of critical risks in the Chinese construction industry. As a result, the projects risk could be evaluated by analyzing the issues such as the competition for tendering and reasonableness of bid price, lack of cooperation between contractors and the owner. In other study done by (Hassanein, 2007), the marked lack of consistency in the contractors risk identification effort been identified as the risk in the power station projects on Egypt. The contractors who have more experience in Egypt were better to identify the relevant risk. Vice versa, the local Egyptian contractors who have vast experience in Egypt but limited project management experience were not really expert to properly identify risks and to take the appropriate exceptions. In fact, the bidders do not include in their proposals on their true lists of exceptions which represent genuine risks to them. CHAPTER 3 RESEARCH METHODOLOGY 3.1 Introduction This chapter will cover how the research will conduct to achieve the objectives of this study. The methodology that will be use are questionnaire survey among the Pahang construction professionals, and preliminary interviews with experts will carry out. The steps are as follows: 3.2 Data Collection 3.2.1 Interview Interview is the effective procedure of data collection because the actuality of condition could be perceived specifically and comprehensively while conducting the interview. For the purpose of this study, as the scope of this study is limited to Pahang, the interview sessions will conduct through two main ways which are telephone interview as well as email interview through the internet. 3.2.2 Questionnaire Questionnaire survey is one of the others way of data collection carry out among selected construction practitioners involve in construction projects. This specialist will working in contractor construction companies. The questionnaire will be identified from interview with construction practitioners and through literature review. The survey questionnaire will administer through e-mail and fax, and postal questionnaire, and secondly through the distribution to selected contractors which are project managers, managing directors, chairman, and head of technical departments operating in the Pahang construction industry. 3.3 Data Analysis All returned questionnaire will be check from completeness and suitability for use in statistical analysis. Next, all the data collected from the questionnaire will be analyse with the assistance of statistical software program called Statistical Package for Social Science (SPSS). After putting the data in SPSS software program, some statistical method will be apply to the data through frequency analysis and mean index, risk analysis matrix, and single sample T-test. After putting questionnaire data into SPSS, some statistical method will be applied to the using frequency analysis and mean index, risk analysis matrix, and correlation test. 3.4 Measurement Most of the question will applied using five point of Likert scale, and other question will applied with multiple choice. The most common scale that will be use is 1 to 5. There are three sections in the questionnaire. Section A will cover about the level of risk in construction project. Participant will be given three choices of answer which is low, medium, and high to scale the risk level according to their perspective. In section B, the typical Likert scale take the following format: Risk level Rare Unlikely Possible Likely Almost certain Score 1 2 3 4 5 Table 3.1: Risk factors In section C, the respondent will be asked to choose the scale between 1 to 5. The scale 1 shows a condition which the probability of strategies been use is minor where scale 5 means the maximum probability of risk strategies usage. Strategies Not important Little important Average Important Very important Score 1 2 3 4 5